Dock edge failure created an unsafe scenario for unloading inbound materials for this customer. Complete replacement of the failed embedded steel channel, new channel and concrete, and a new Edge-of-Dock leveler were required. Upon completing the first dock position, the second dock position was also repaired and upgraded as well. All work performed in-house by a certified Rice Equipment technician!